Administration Tower
The Administration Tower is a major government high-rise currently under construction in the northeastern corridor of Taz’Vaar, initiated by the Ravvaar Syndicate in Ghraaldra 23, 2713. It is intended to serve as the central coordination hub for public contracts, inter-syndicate records, and legal documentation across the lower and middle districts. Planned to rise over 512 meters upon completion, the tower represents a shift away from the opaque power centers of earlier eras, emphasizing transparency, accessibility, and civic presence. Unlike the fortified and historic Shard Tower, the Administration Tower is designed to be modular, expandable, and accessible to mid-tier contract-holders and licensed civilians.
Construction proceeds in phased vertical segments, with major systems and interior wings being fitted concurrently with external frame expansion. Key structural levels—including the arbitration floors, civil registry archives, and oversight platforms—are already in varying stages of activation. Power routing, multi-layer comms infrastructure, and lift routing have been completed up through Floor 86 as of Nytmadra 19, 2724. Fabrication crews work on rotational Syndates, maintaining near-continuous progress with support from dedicated drone teams and low-tier contractor guilds. Interior systems are being designed for direct neural-interface compatibility, contract-encoded access zones, and minimal reliance on manual oversight.
The tower has become a symbol of Ravvaar’s long-term restructuring efforts—neither ideological nor ceremonial, but infrastructural. While some Vey’Zari view it as a cold monument to bureaucracy, others see it as a stabilizing anchor in a city where most power remains behind closed doors. Once completed, it will house permanent administrative offices, standardize dispute resolution across all tiers, and replace dozens of fragmented legacy buildings still used throughout the city. No formal date has been set for completion, but full operability is projected before 2727, pending syndicate cooperation, the ratification of the Taz'Vaar Constitution, and uninterrupted material flow.
General Information
Style
Modern design
LocationCity Center District, Taz’Vaar, Thauzuno
Current StatusUnder construction
Construction StartedGhraaldra 23, 2713 (12 years ago)
Expected CompletionBy 2727
OwnerRavvaar Syndicate
Building Details
Planned Height
512 meters
Planned Floors135
Completed Floors (as of 2725)86
Structure Materials
Alloy spinal frame, ferrometal sheathing, adaptive wind-hull
SecurityID-based clearance, automated checkpoints
Design and Construction
Architect
Ravvaar Syndicate
- Nira Kelzhan; Infrastructure Director
- Nirvath Syrvath; Chief Architect
Veyra Construction Corporation
PurposePublic administration, city governance, records, arbitration
StatusActively under construction

Comments